We install ourselves. The construction must sit true, the door move easily, seals without gaps.

Stages
01

Site readiness

Shower — after tiling and finished plumbing. Office/home — at an agreed finish stage.

02

Survey

Geometry, fixings, tolerances. We agree details if anything drifted from plan.

03

Fabrication

Glass and hardware to approved sizes.

04

Install

Fit, adjust hinges/rollers, check travel and seals.

05

Handover

Walk through the result and care notes.